Cable industry

Transport of cable drums to wind-up station

The task:

  • Industry branch: cable manufacture
  • Load: cable drums of different sizes
  • Application site: production area
  • Truck: pedestrian/ride-on version, construction and transfer loader
  • 9000 kg capacity

The solution:
Girder transporter EDK 90

  • load section as flange unit
  • fold-up stand-on platform
  • clear of ground lifting load
  • lift device secured by safety catch
  • total length: 3405 mm
  • total width: 2025 mm
Contact

If you have any questions or if you want more information we are at your disposal

Please contact us